Step 1: The owner inspects the roof
You call, or you use the quote button. Phones are open 24 hours, seven days a week, and we text or call back within the hour to agree on a day. The visit needs dry weather, because a wet or icy roof cannot be walked safely.
The owner inspects every job himself. He looks at the shingles, the flashing, the valleys, the vents and the roof edge, and at the underside of the deck where there is an attic hatch. He measures the roof and takes photos as he goes. Nobody else is sent in his place, and nobody stays behind to sell.
Step 2: A photo report the same day
The report shows what he saw. Wide shots of each slope come first. Close-ups of each problem follow, each with a short caption. At the end the roof gets one of three ratings.
If one part has failed and the roof is otherwise sound, the report says so and points to a roof repair instead. What the inspection covers is listed on the free roof inspection page.
Step 3: One flat written quote
When a roof rates Replace Soon, you get one written price good for a year. It is a single flat figure for the whole scope. There is no sign-today discount, because there is no deadline. Take it to the kitchen table, compare it, sleep on it. The page on roof replacement cost in North Canton explains what the number is built from.
The quote also names the shingle line and the color you chose. Colors are picked with the owner, looking at samples against your own house.
Step 4: The install
Roof replacements are being scheduled from spring 2027. On the day, the work follows a fixed order.
- A dumpster is set, and the old shingles are torn off down to the deck.
- The bare deck is checked, and soft or damaged wood is replaced.
- Ice and water shield goes on at the eaves and in the valleys.
- Synthetic underlayment is rolled out over everything else.
- Drip edge and starter strip are fitted at the edges.
- Architectural shingles go on, then the ridge vent and ridge caps.
An average house commonly takes one to two days. Steep pitches, extra layers and rain can add to that. A few things make the day easier at your end. Move cars out of the garage and off the driveway the night before. Take down anything fragile hanging on upstairs walls, since tear-off shakes the house a little. Keep pets and children indoors while work is overhead.
Step 5: Cleanup and a final look
The old roof leaves in the dumpster. The yard, the beds and the driveway get a magnet sweep for nails. Then comes a final walk-through and photos of the finished roof, so you can see the ridge, the valleys and the flashing without climbing a ladder. If new gutters are part of the job, they go on the same week. See roof and gutters together.
Where do permits fit in?
Between the quote and the install. A house inside the city is permitted through the Building and Permits Division at City Hall, 145 North Main Street. A North Canton address in Plain, Jackson or Lake Township is permitted through Stark County. Our post on roof permit steps at City Hall has the detail.
What will you not get?
- A salesperson. The owner does the looking and the pricing.
- A price that changes with the day of the week.
- A push toward a new roof when the old one rates Good.
- Roofing other than asphalt shingles. No metal, no slate, no tile and no flat roofs.
Who is behind this site?
North Canton Ohio Roofing is the name on the site. The phone is answered by Guttrz, a locally owned company based right here in North Canton. That is why the first step can happen quickly and why a question after the job gets an answer from someone nearby. To see what the finished job includes, go to roof replacement in North Canton.
Process questions
Do I have to decide at the inspection?
No. The inspection ends with a photo report, not a contract. If the roof needs replacing, the written price is good for a year and the decision is yours to make when you are ready.
What if the report says my roof is fine?
Then you keep your money. A Good rating means nothing needs doing, and you have dated photos to compare against in a few years.
Can I pick the install date?
Yes. Replacements are being scheduled from spring 2027, and the date is agreed with you once you accept the quote. Weather can move it by a day or two.
Step one takes a phone call
Ring at any hour, or use the quote button and expect a text or call back within the hour.